The overpass over Mze river on the city bypass, Pilsen

Pilsen | Czech Republic | Valbek EU
A part of the new bypass around Pilsen in Czech republic is a remarkable viaduct that stretches over floodplain of the Mže river, sitting 20 meters above the ground. It consists of three separate bridges with a total length of 1.2 km. This overpass was designed by the skilled engineers at Valbek Company, a design office with a long tradition of designing linear structures. Throughout the design process, the engineers encountered various challenges, and to overcome them, they harnessed the power of IDEA StatiCa BIM and RCS solutions.

About the project

This important transportation route circumvents the city in a length of 3.3 kilometers, reducing traffic congestion and enhancing the connectivity of the region. The bypass, which was put into service in February 2023, features a stunning viaduct over the inundation area of the Mže River that incorporates a balanced cantilever bridge, which is a key highlight of the entire infrastructure.  

The viaduct is divided into three expansion sections supported by a total of 36 pillars. The initial two sections, spanning approximately 510 meters each, were constructed using the incremental launching method. The third section, commencing at support P33, was built using the balanced cantilever method. This bridge is designed with three theoretical spans of 52.543 meters, 85.416 meters, and 51.106 meters. The Mže River flows beneath the second span, flanked by two adjacent country roads. The substructure comprises three pillars, one of which includes a dilatation joint, and an abutment.

The construction of the superstructure began at Pier P34. Initially, the pier table was erected, and two formwork travelers for cast-in-situ segments were assembled. Subsequently, 5-meter segments were constructed symmetrically using these travelers. To erect each segment, two 19-wire tendons made of prestressing steel Y1860S7-15.7, provided by the fabricator VSL, were utilized. The cross-sectional height of each segment tapers from 5.0 meters toward the center of the span to the height of 2.1 meters. Once the balanced pair of segments was completed at P34, a similar pair was constructed on pier P35 using the same method. Finally, each section of the substructure was connected by closure segments placed in the middle of the spans.

Engineering challenges

The balanced cantilever method involves numerous series of construction stages, with each segment requiring a distinct design. Furthermore, the design of each cross-section is carried out in two phases, first for the lower U-shaped portion and subsequently in conjunction with the upper deck. This intricate process is time-intensive and intricately connected to the time allocated for calculations. Nonetheless, this meticulous approach is a common feature together with camber configuration of projects of this kind. 

Moreover, the engineering team encountered various formidable challenges, encompassing code checks for different pier cross-sections and geometrically nonlinear calculations, tackling second-order concerns associated with piers via linear buckling analysis, and executing nonlinear calculations to assess additional internal forces.

Solutions and results 

The engineer in charge of the project, Ondřej Matoušek, was interviewed to explain how he manages his work on such a complex project. First, a model is crafted of the entire bridge and analyzed with specialized FEA computer software Midas Civil

To move the data from Midas Civil to IDEA StatiCa, he employs IDEA StatiCa BIM to replicate the model, including all cross-sections and tendon-related information. Since the model encompasses all construction stages, the data volume becomes overwhelming, resulting in nearly 200 extremes for a single section, which significantly slows the software's performance down. 

To overcome this challenge, Mr. Matousek adopted a workaround by creating an RCS file for just one construction stage. Following this, he exclusively exports the information pertaining to the tendons and cross sections. This approach leads to significant time savings for Mr. Matousek, enabling him to modify tendon-related details in Midas Civil and seamlessly transfer those changes to IDEA StatiCa via RCS with just a few clicks. This streamlined process provides him with effective control over the model.

Working with IDEA StatiCa is fast, reliable and flexible. It is really easy to design cross-sections used for this kind of bridge in IDEA StatiCa RCS. It would be very time consuming if I had to do the calculation by hand.
Ing. Ondřej Matoušek
Ing. Ondřej Matoušek
Responsible Engineer – Valbek EU
Czech Republic

Mr. Matousek has been using IDEA StatiCa at Valbek for several years and has mastered its full potential. In a notable project he worked on for his thesis, he went the extra mile by conducting manual calculations and subsequently comparing them. Surprisingly, the results were a perfect match. The key distinction lay in the time required to obtain these results. Using IDEA StatiCa RCS, he achieved the results within a day, while the manual calculations consumed several days and countless hours of effort.

About Valbek 

Valbek, a company established in 1990, is an office that specializes in the design of linear structures. With over three decades of expertise in their field, they operate across 20 interconnected disciplines, providing their employees with a wide range of project design opportunities, spanning from small to large-scale endeavors or the chance to specialize in specific areas of their choosing. Valbek boasts a dedicated team of over 200 highly skilled structural engineers and 50 detailers. While their headquarters are located in Liberec, Czech Republic, they have also expanded their presence into Slovakia, demonstrating their commitment to delivering innovative and high-quality solutions in the realm of linear structure design.



Probeer IDEA StatiCa gratis uit

Start vandaag nog je proefperiode en geniet 14 dagen van volledige toegang en gratis services.

OTHER CASE STUDIES

De Boogspoorbrug, Jetetice

Dakconstructie AFAS Stadion

Halle des Saveurs

Gevelbehoud constructiesteun

Valbek EU

Valbek EU

Czech Republic
Valbek Group currently has 11 business entities. The company VALBEK-EU, a.s. is the parent company of 10 subsidiaries, which are engaged in various fields of engineering. We operate in the Czech Republic, Slovakia, Ukraine and Sweden. Detail