Update of the connection projects after a change in the FEA model

Tento článek je dostupný také v dalších jazycích:

Change in the FEA model can be easily updated to the previously exported connection projects by the Synchronize all command for all items in the Code-check manager.

This workflow has been shown during our unique webinar for Graitec Advance Steel Academy 2020. 

Související články

Streamlining connection design workflows between detailers and engineers