Minta projekt
Column build-up
Cutout of a steel structure completely solved in the IDEA StatiCa Member app. Battened columns with two chords anchored through a base plate to a concrete footing. A moment connection at the top consists of two hollow members welded to the main girder and the girder welded straight to the column.