Idea Statica
14-Day Trial
CompanySample projectsThe overpass over Mze river on the city bypass, Pilsen
The overpass over Mze river on the city bypass, Pilsen

The overpass over Mze river on the city bypass, Pilsen

Czechia | Valbek EU

The new part of a bypass in Pilsen was put into operation in February 2023.

An important part of the whole project is a 1.2 km long overpass, which is realized by three separate bridges. The overpass goes over the floodplain of the Mže river and crosses some country roads, two roadways and one access road. The part of the bridge that was designed in IDEA StatiCa is the three span bridge erected using the balanced cantilever method. The total length of this bridge is 188 m with a theoretical length of the main span of 85 m. The height of the superstructure is 2.1 m in the middle of the span and 5 m at the pier. The bridge is 7.5 m wide between the barriers and carries traffic in both directions. In the future, a parallel bridge and directional traffic distribution are planned.

Gallery

1 of 4

Gallery

4 of 4
1 of 4
Valbek EU

Valbek EU

Fabricator | Czechia

Valbek Group currently has 11 business entities. The company VALBEK-EU, a.s. is the parent company of 10 subsidiaries, which are engaged in various fields of engineering. We operate in the Czech Republic, Slovakia, Ukraine and Sweden.

Explore

Subscribe to our newsletter

Company

  • About us
  • Partners
  • Careers
  • Patent

Resources

  • Sample projects
  • Case studies
  • Connection Library
  • Verification books

Legal

  • EULA
  • Privacy policy
  • TOS Viewer
  • Licensing

Help

  • Contact
  • Submit case
  • Resellers
  • Downloads
FacebookInstagramLinkedInYouTube

© IDEA StatiCa 2009-2026

Trusted and used worldwide by engineers, fabricators & consultants.